BLIZUCHENKO ANDREY LEONIDOVICH INDIVIDUAL ENTREPRENEUR

Progress report on the “Roslavl Bakery Plant Construction” investment project which is implemented by Blizuchenko Andrey Leonidovich IE (Roslavl) 

Project Delivery Time: 2015-2020 

Total Investment Amount: 0.45 billion Rub. 

Social Return: 200 new jobs 

Within the project framework, a bread-making plant with a capacity of 50 tons per twenty-four hours has been constructed. The production area is 8 300 m2 on the site of the former haydit plant.

In 2018, there was put into operation the first stage of the bread-making plant construction: a boiler room was installed, a production area was prepared, and the equipment was installed. Currently, the plant is producing 12 items of bakery products (15 tons a day). The number of personnel is 110.

It is also planned to construct the second plant part with the purpose of expanding range of goods (for production of gingerbreads, cookies and other products), as well as its own flour mill. . 